Investing

Wide Zones of Mineralisation Results Returned from Lord Byron Infill Drilling

Brightstar Resources Ltd (ASX: BTR) (Brightstar) is pleased to announce the first results from RC infill drilling at the Lord Byron deposit, part of the 293koz Au Jasper Hills Gold Project. The program is targeting gold mineralisation within conceptual open pit shells beneath and between the existing open pits in order to increase confidence in the current resource.

HIGHLIGHTS

The first assay results have been received from the ~8,000m Lord Byron infill drilling program at the Jasper Hills Gold ProjectThe program forms part of an Reverse Circulation (RC) and Diamond (DD) drill-out at Jasper Hills, which was designed to infill the resource, improve the JORC classification and provide information for mine planning at the proposed Lord Byron Open Pit and Fish Underground mines announced in the Jasper Hills Scoping Study1Intercepts returned at Lord Byron, targeted to be mined via an open pit in 2025, include:LBRC24034:32m @ 1.25 g/t Au from 53mLBRC24007:24m @ 1.53 g/t Au from 53mLBRC24037:19m @ 1.34 g/t Au from 73mLBRC24001:14m @ 1.44 g/t Au from 77mLBRC24015:12m @ 1.73 g/t Au from 177mLBRC24016:15m @ 1.47 g/t Au from 178m LBRC24008:5m @ 4.29 g/t Au from 92mLBRC24054:9m @ 1.47 g/t Au from 29m, and7m @ 3.36 g/t Au from 129mLBRC24032:9m @ 2.05 g/t Au from 95m, and4m @ 3.12 g/t Au from 71mLBRC24027:5m @ 2.13 g/t Au from 52m 54 RC holes and 2 DD holes have been drilled at Lord Byron, with assays pending for 25 RC holes, and an additional 9 DD drillholes remaining to drill at Lord Byron30 RC holes and 8 DD holes have been completed at the Fish deposit, with assays to be reported when received and analysed. This drilling was completed to provide geological, metallurgical and geotechnical information to support near term mining operationsThe RC drilling rig has completed the program at Jasper Hills and has remobilised to Menzies to complete the infill drilling program at the Lady Shenton depositA diamond drill rig is presently at Lord Byron completing a ~1,500m program with completion of all drilling at Jasper Hills targeted by early September 2024

Brightstar’s Managing Director, Alex Rovira, commented“These assays represent the first results from the recently acquired Linden Gold exploration package at the Jasper Hills Gold Project. The results are highly encouraging and align with grades and widths we expected from the existing 244koz Au mineral resource.

The increased confidence from this infill drilling will feed back into future resource estimates and ultimately help guide the near-term development of open pit mining operations at Lord Byron, as detailed in our recent scoping study1, which outlined the highly profitable production of 2.2Mt @ 1.6g/t for 115koz Au over three years.

Drilling continues with two drill rigs currently active at the Jasper Hills and Menzies Gold Projects, which will generate ongoing news flow in the coming months as assays are received and our geological understanding develops across our portfolio.”

TECHNICAL DISCUSSION

The RC drilling program at the Lord Byron totals 54 drill holes for ~8,000m of drilling, with assays pending for 25 holes.

The program aimed to infill the inferred portion of the resource within optimised open pit shells to a nominal 20m x 20m spacing in order to facilitate and upgrade of the resource to Indicated classification. This supports the ongoing definitive feasibility study and the assessment of a potential fast-tracked mine development.

An additional 1,500m diamond drilling program is presently underway at Lord Byron, which will provide structural, geotechnical, and metallurgical data for mine design and planning purposes.

Click here for the full ASX Release

This post appeared first on investingnews.com